CWE-ES-06
Compassion, Welfare & Environment
Environment & Sustainability
CORE
Excellence
v2.9.7
Use of Renewable Energy Sources
This criterion evaluates the use of renewable energy, reflecting the duty of khilāfah (stewardship) over the environment. By reducing its carbon footprint, the organization serves the maṣlaḥah (public interest), enhances operational resilience, and builds trust with its stakeholders. The Prophet (ﷺ) taught that removing harm is charity (Sahih Muslim 35); reducing pollution and emissions through renewables is a modern form of removing harm (lā ḍarar), benefiting neighbors and the wider creation.
Basic 1
-
Use of renewable energy is evident (e.g., on-site solar panels, subscription to a green energy tariff).Infrastructure Essential
Good 2
-
Documented policy or plan for increasing renewable energy use with a specific baseline year.Documentation Important
-
Named senior owner (trustee/executive) accountable for renewable targets; risks/opportunities recorded in risk register, with board review at least annually.Governance Essential
Better 9
-
A system for tracking the percentage of energy from renewable sources.Monitoring Important
-
The renewable energy policy includes specific, time-bound targets for increasing the percentage of energy consumption from renewable sources.Performance Important
-
A formal assessment or feasibility study for on-site renewable energy generation has been conducted within the last five years (or a documented feasibility note regarding landlord constraints for tenants).Monitoring Important
-
Progress towards renewable energy targets is reported at least annually to key stakeholders. Minimum disclosure must include: Boundary and baseline year, total kWh (electricity/heat), % renewable split, REGO/RGGO retirement evidence summary, and Scope 2 dual reporting.Governance Important
-
Renewable energy potential and energy efficiency are formal criteria in the decision-making process for new facilities, major renovations, and large equipment procurement.Governance Essential
-
Scope, definitions, and KPI calculation protocol are documented: (a) Boundary covers all stationary energy (electricity + heat); (b) Heat Pumps: count as renewable heat only if input electricity is REGO-backed; (c) Biomethane: count only if RGGOs are retired via GGCS; (d) District Heat: count only if network provides verified renewable fuel-mix evidence; (e) Supplier ‘green’ claims must be evidenced by EAC retirement; offsets do not count toward this KPI.Documentation Essential
-
Tenant/Shared Premises Pathway (if applicable): Maintain a landlord engagement log, document annual escalation steps, and include green clauses at lease renewal (data sharing, consent for PV/heat pump, EPC improvement, sub-metering).Documentation Essential
-
Small Charity Route: Where PPAs are impractical, utilize 100% REGO-backed tariffs + heat decarbonisation progress + documented plan to move to higher-additionality procurement.Sustainability Medium
-
Green lease clauses and landlord engagement planCollaboration Medium
Best 9
-
Active investment in renewable energy technology (e.g., solar panels, heat pumps)Sustainability High
-
A Power Purchase Agreement (PPA) for green energy is in place (Definition: enables new capacity/additionality, clear commissioning date, exclusive EAC retirement).Collaboration High
-
Public carbon footprint reporting aligned with CMA Green Claims Code.Transparency Medium
-
Heat decarbonisation roadmap (electrification, heat pumps, thermal storage)Sustainability High
-
Battery storage and demand response/time-of-use optimisationEfficiency High
-
Community energy or sleeved corporate PPA partnershipsCollaboration High
-
End-of-life and recycling plan for PV/batteries (WEEE compliance and EPA 1990 Duty of Care)Sustainability Medium
-
Third-party assurance of energy and emissions dataTransparency High
-
Prioritise additionality through new-build PPAs; disclose EAC source, vintage, and retirement IDs; publish both market- and location-based Scope 2.Transparency High
Related Criteria
Version
2.9.7
2025-11-05
Discussion (1)
Administrator
2026-03-07 12:01:25.730391
📋 **Version updated: 1.0.0 → 2.9.7** **Changes:** Full import from mizan-297.json
Sign in to post a comment.